Nuclear

Fusion Breakthroughs: The Real Milestones (2021–2026)

The Sun, powered by nuclear fusion

Updated September 2026. An earlier version of this page described an “MIT sustained fusion reaction” in 2019 and 2020. No such experiment took place, and it has been removed. Below are the real milestones.

For decades, the running joke has been that fusion power is “30 years away, and always will be.” The last few years have produced genuine records. None of them is a power plant yet, but together they show real progress on each of the separate problems fusion has to solve. (For how fusion works, see Nuclear Fusion Explained.)

The milestones that matter

  • 2021, a record magnet. Commonwealth Fusion Systems and MIT tested a high-temperature superconducting magnet at 20 tesla, a field strong enough to make much smaller, cheaper fusion machines possible.
  • December 2022, ignition. The National Ignition Facility (NIF) in California became the first experiment to get more fusion energy out (3.15 megajoules) than its lasers delivered (2.05 MJ).
  • October 2023, the most fusion energy ever. In its final experiments before closing, the Joint European Torus (JET) in the UK released 69 megajoules over 5.2 seconds, from just 0.2 milligrams of fuel. The result was announced in February 2024.
  • January 2025, a long run. China’s EAST tokamak held a high-performance plasma for 1,066 seconds, nearly 18 minutes.
  • February 2025, a longer one. France’s WEST tokamak sustained a plasma for 1,337 seconds, about 22 minutes.
  • April 2025, more gain. NIF produced 8.6 MJ from 2.08 MJ of laser light, a gain of about four.
  • May 2025, a stellarator record. Germany’s Wendelstein 7-X set a record for the “triple product” (the combined measure of density, temperature and confinement time that fusion must reach) for plasmas lasting 43 seconds.

What these records don’t show

No experiment has yet produced more electricity than the whole facility uses:

  • NIF’s “gain” counts only the laser light that reaches the target, not the far larger amount of grid power the lasers draw.
  • The long-duration records at EAST and WEST were set with ordinary hydrogen plasmas that produce almost no fusion.
  • A working power plant will need all of these achievements at once, continuously, for years, while breeding its own tritium fuel and surviving intense neutron bombardment.

What’s next

  • ITER, the international megaproject in France, now plans research operations from 2034 and burning deuterium-tritium fuel from 2039.
  • Commonwealth Fusion Systems aims to switch on its compact SPARC tokamak in Massachusetts and show net energy gain. It plans a grid-connected plant in Virginia in the early 2030s.
  • Helion has begun building a plant in Washington state and has promised power to Microsoft from 2028.
  • China is building several new machines and is investing heavily.

Private fusion companies have now raised well over $10 billion. The next few years should show whether their faster timelines hold up.

More: Could Fusion Power Industry?

Sources

Keep reading