Almost all of the power grid runs on alternating current (AC). For moving very large amounts of power over very long distances, though, high-voltage direct current (HVDC) is often the better tool. As the best wind and solar sites are frequently far from cities, HVDC lines are becoming the backbone of the clean-energy grid.

Why DC for long distances?

  • Lower losses over distance. An AC line wastes some capacity pushing “reactive” power back and forth, and the loss grows with length. A DC line doesn’t. Beyond a few hundred miles overland, HVDC usually loses less energy.
  • Under water and underground. Long AC cables act like capacitors and become impractical after a few tens of miles. That’s why offshore wind farms far from shore, and long buried lines, use DC.
  • Linking separate grids. HVDC can connect grids that aren’t synchronized, even ones running at different frequencies. Operators can also control exactly how much power flows.
  • Narrower corridors. For the same power, DC lines need fewer conductors and smaller towers.

The downsides

  • Expensive converter stations are needed at each end to switch between AC and DC. That makes HVDC uneconomic for short runs.
  • Hard to tap along the way. Most lines run point to point. True multi-point DC networks need DC circuit breakers, which are still maturing.
  • Permitting. In the US, the biggest obstacle isn’t technology. It’s getting approval to cross many states, counties and private properties, which can take a decade or more.

HVDC lines worth knowing

  • Pacific DC Intertie (1970, upgraded since) carries power roughly 850 miles from the Pacific Northwest to Los Angeles.
  • Changji–Guquan, China (2019) is the world’s first 1,100 kV line. It carries up to 12 GW across 3,300 km.
  • SunZia (2026) is a 550-mile, 3 GW line carrying New Mexico wind power to Arizona and California. It went into commercial operation in 2026.
  • Champlain Hudson Power Express (2026) is a fully buried 339-mile, 1,250 MW line bringing Québec hydropower to New York City. It was energized in June 2026 and is expected to supply close to a fifth of the city’s electricity.

Related: Smart Grids and Renewable Energy and Desert Power.

Sources

Keep reading

The Energy Grid newsletter

One clear email when something new lands.

New explainers and the breakthroughs worth knowing about. No spam, unsubscribe any time.